Planning achieved at Dalston

July 14, 2025

This project represents T2S' core values:

​

Retaining / extension existing buildings.

Increasing density in urban areas.

Create 7 new homes which promote the use of public transport.

​

The key brief from the client prioritise the separation the ground floor commercial space which is now letted by William Hill.

​

The existing building was tired and out of sync with the wider terrace, based upon the fact that the site had been bombed in WW2 and replaced with a 1960's structure.

​

Our design is split into two facets. At the front, the new facade is it reinstate the historic grandeur of the wider terrace. This represents a formal, vertical language.

​

At the rear, a modern form is created which follows completely different Architectural principles using an informal language.

​

Construction will begin in September, with completion due in September 2026.

​

Credit to the team:

​

Planning Consultant - Centro Planning Consultancy Aaron Zimmerman, MA, MSc, MRTPI Tarun Cheema

Fire - Fire Safety SE

Air Quality + Noise - Hawkins Environmental Limited

AVR / CGI's - Pre-construct

Energy + Overheating - JS Lewis Ltd

Heritage - JB Heritage Consulting Ltd